You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Breakwater Rusak di Pulau Panggang Hampir Selesai

Breakwater Renovation in Panggang Island Reaches 87 Percent

Breakwater levee renovation in the north side of Panggang Island, North Seribu Islands Sub-district, Seribu Islands, has reached 87 percent.

From those two spots is remain around 40 meters in total. Renovation progress just hampered by weather

The renovated levees are located in two spots, each of them have 100 meters and 200 meters long. It was hit by big waves last week. 

Breakwater on North Side of Panggang Island Broken

Seribu Island Water Resources (SDA) Sub-dept. Head, Mustajab, said breakwater renovation in Panggang Island was targeted to be finished next week.

"From those two spots is remain around 40 meters in total. Renovation progress just hampered by weather," he said, Saturday (3/4).

He added the renovation also ncluding cube strap replacement. Previously, it used crossed wire, but now will use nylon strap which is rust resistant and stronger.

Besides, disarranged bronjong (rocks wrapped in plaited wires) caused by waves is also repaired.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1054 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye990 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye962 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye912 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye702 personAldi Geri Lumban Tobing